The rehabilitation project for Al-Adhaim Dam in Diyala Governorate, Iraq, is an ambitious project aimed at improving and developing the infrastructure of the dam. It includes several important works that will contribute to restoring life to this strategic dam.
Supply, install and commissioning with all pipes an fittings
1- Two units of hydraulic cylinders with hydraulic power unit for power intake
2- Two units of hydraulic cylinders with hydraulic power unit for intake diversion tunnel
3- Two units of hydraulic cylinders with hydraulic power unit , hydraulic accumulator with nitrogen back – up tank for the butterfly valves
4- Two units of hydraulic cylinders with hydraulic power unit for the con valves
5- one unit of double girder gentry crane
6- One unit of monorail crane
7- Two unit of generator set , Two unit of Enclosures Electrical kiosk , Main and Secondary Electrical Panels with all Cables
8- Flow and water level Instrumentation System , CCTV System